Non-Compliance detail


  
Summary
 
Licence number: 766
Annual Return Start: 01 Jan 2006
Annual Return End: 31 Dec 2006
Date Received: 28 Feb 2007
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 the sampling plane locations in the boiler ductwork at wallerawang power station do not satisfy the requirements of AS4323.1-1995 with regard to the upstream and downstream distances from disturbances Appropriate Action taken by licensee 1